← Selected Work

BIM Process / Case Study

Jeddah, Saudi Arabia

Architecture BIM & Documentation

Four Seasons Hotel
Jeddah.

A hospitality BIM package focused on accurate architectural modelling and partition shop drawings, balancing Interior Design intent, wall performance, and MEP execution requirements.

Hand sketch representing Four Seasons Hotel

Scope Of Work

Hospitality detail, coordinated to perform.

Every partition and finish interface needed to respect the intended guest experience while carrying the technical conditions required for construction.

01

Architectural Model

Develop accurate architecture and partition model content to LOD 400, with details that support coordinated documentation.

02

Partition Shop Drawings

Translate the agreed interior and architectural intent into clear, buildable wall and interface information.

03

ID & MEP Coordination

Resolve ceiling, services, performance, and finish constraints around each high-detail hospitality zone.

Technical scope sketch for Four Seasons Hotel

Delivery Methodology

Keep the design intent
intact through delivery.

A controlled coordination loop kept architectural quality and technical performance visible together as the fit-out package developed.

01

Define The Assembly

Set out partition types, finishes, levels, and required information as a reliable design-to-delivery basis.

02

Review The Interfaces

Coordinate each wall and ceiling condition with the Interior Design and MEP teams in the federated model.

03

Document The Solution

Validate the coordinated details before they become controlled shop-drawing information.

Technical methodology sketch for Four Seasons Hotel

Core Environment

RevitNavisworksAutodesk Construction CloudShop DrawingsParameter Population
Secret Link