← Selected Work

BIM Process / Case Study

Riyadh, Saudi Arabia

Waterproofing BIM Coordination

Aquarabia
Al Qiddiya City.

A waterproofing BIM package coordinated with architecture, structure, suppliers, and site teams—making the continuity of critical protection systems clear before execution.

Hand sketch representing Aquarabia

Scope Of Work

Protection systems need precise interfaces.

Waterproofing was developed as coordinated model content rather than an isolated layer, so transitions, penetrations, and supplier requirements could be reviewed together.

01

Waterproofing Model

Model waterproofing assemblies, build-ups, upstands, and transitions in the areas where continuity is critical to delivery.

02

Architecture & Structure

Coordinate the protection strategy with levels, substrates, joints, and structural conditions that govern its installation.

03

Supplier & Site Alignment

Use the model to align manufacturer input, contractor sequencing, and key installation interfaces before site execution.

Technical scope sketch for Aquarabia

Delivery Methodology

Keep every layer
working as one.

Autodesk Construction Cloud and Revizto supported a visible workflow for reviewing interfaces and turning technical constraints into clear coordination actions.

01

Map The Interfaces

Identify high-risk transitions, openings, joints, and system changes before detailed coordination begins.

02

Review In Context

Federate architectural, structural, and supplier information to review the waterproofing system in its actual built setting.

03

Close The Actions

Record and resolve clashes through the shared environment so decisions stay traceable through delivery.

Technical methodology sketch for Aquarabia

Core Environment

RevitAutodesk Construction CloudReviztoNavisworksSupplier Inputs
Secret Link