← Selected Work

BIM Process / Case Study

Dammam, Saudi Arabia

Architecture & Early Structural BIM

Nupco Holding
Warehouse.

An early-stage LOD 200 Revit model that established a reliable foundation for planning, quantity studies, schedules, and the project’s later BIM development.

Hand sketch representing Nupco Holding

Scope Of Work

Start with a model that can grow.

The initial architecture and structural logic was organized early so project information could support practical planning rather than begin as disconnected geometry.

01

Architectural Model

Create a clear LOD 200 Revit model that captures the warehouse layout, massing, key spaces, and primary building information.

02

Early Structure

Introduce the principal structural basis needed to test planning assumptions and establish a coordinated project framework.

03

Industrial Standards

Apply relevant industrial planning and modelling principles to structure the model for future project development.

Technical scope sketch for Nupco Holding

Delivery Methodology

Make early information
useful from day one.

The model was deliberately structured to inform decisions immediately while remaining ready to absorb the detail required by later project stages.

01

Establish The Basis

Set project coordinates, levels, grids, model standards, and a clear scope for the LOD 200 stage.

02

Model For Planning

Develop architecture and early structure that supports layout review, schedules, and quantity studies.

03

Prepare The Next Stage

Validate and organize the information so future contributors inherit a dependable BIM foundation.

Technical methodology sketch for Nupco Holding

Core Environment

RevitSchedulesQuantity StudiesModel StandardsIndustrial Planning
Secret Link